Back to Available Packages

Tap and hold, then drag to rotate the building.

50 x 70 x 18 Steel Building Package

A large clear-span steel building package with an 18 ft eave height for commercial storage, operations, or flexible multi-bay use.

Pricing

Prices include estimated shipping to your selected province. Choose a different province below to update your estimate.

Delivered $88,054

Includes estimated shipping to your selected province.

Color Selector

Color Selector

Wall Panels

Selected: Polar White

Roof Panels

Selected: Burnished Slate

Trim

Selected: Polar White

Description

Specification

Width
50'
Length
70'
Eave height
18'
Roof pitch
2:12
Openings
The preliminary plan shows standard framed openings. Opening counts, sizes, and locations can be revised with us before the engineering deposit.
Roof & wall sheeting
26 gauge coated steel sheet, screw-fastened roof and wall panels. Colour confirmed after approval.
Girts & Purlins
14 gauge cold-formed Z-sections. Spacing and bridging per engineered drawings.
Primary framing
Pre-engineered rigid frame with built-up primary members and bolted field splices. Clear-span bays.

Make an Offer

Send an offer or request a callback on this exact package.

SKU HSB-5070-18
Size 50' x 70' x 18' eave, 2:12 roof slope
Province Ontario
Delivered $88,054